Bottom Of Board
Key Facts
Abbreviation
BOB
Pronunciation
/ˈbɑtəm əv bɔrd/
Category
Miscellaneous
Related Field
Unclassified
Examples in Context
- The rough pavement will cause the coupling of the vehicle board, this would produce and increase the dynamic strain at the bottom of board, and thus speed up the weariness damage of the cement concrete pavement board.
- Note : Thermocouples must be placed on top and bottom side of board for double sided boards.
- Auxiliary Pole : work with direction wheel at bottom of push board, ensure pipe moving direction.
- Combined with constructive practice of highway project, it analyzes common problems in hollow board prefabrication from aspects of over thickness in bottom of prefabricated hollow board 、 under thickness in top of the board and thin concrete in bottom of the board and puts forward effective resolving measures.
- Calculation of at the bottom of concrete board
Other meanings of BOB
Bolivian Boliviano
Regional
BOB Image file Bitmap graphics
Computing
Best Of Business
Business
Brains On Board
Internet
Best Online Buddy
Internet
Bolt On Box
Computing
Big Orange Ball
Academic
Back Of the Book
Academic
Born On Board
Gov