Prestressed Concrete Erection

Views Updated: Dec 15, 2025

Key Facts

Abbreviation
PCE
Pronunciation
/ˌpriːˈstrɛst ˈkɒnkriːt ɪˈrɛkʃən/
Category
Miscellaneous
Related Field
Construction

Examples in Context

  1. Prestressed concrete bridge erection
  2. 24m Span Prestressed Concrete Roof Trusses Erection Technology
  3. Using the Experiences of Prestressed Concrete on the Erection of Inverted Taper Shaped Water Tower and Cistern
  4. With the increasing of long span prestressed concrete bridge adopting cantilever erection construction method, more and more attention are paid to the correlative geometry control theory and practice of long span continuous box girder.
  5. The offshore approach spans of Hangzhou Bay Sea-Crossing Bridge are all designed to use the 70-m span prestressed concrete box girders that are first simply supported and then made continuous during erection.

Other meanings of PCE