Work Breakdown Structure

Views Updated: Dec 15, 2025

Key Facts

Abbreviation
WBS
Pronunciation
/wərk ˈbreɪkˌdaʊn ˈstrəkʧər/
Category
Academic & Science
Related Field
Electronics

Examples in Context

  1. Civil and systems construction will use the same five-segment work breakdown structure used by design.
  2. Defines and tracks project plan and work breakdown structure.
  3. The application of Work Breakdown Structure(WBS) ( WBS ) in aero-engine model development was introduced The innovation and benefit on the application WBS in engineering were analyzed.
  4. See also work package, control account, contract work breakdown structure, and project summary work breakdown structure.
  5. It includes a Work Breakdown Structure(WBS) illustrated with activity diagrams.

Other meanings of WBS